Nortel Networks NTNM13XKAB Uživatelský manuál Strana 30

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 45
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 29
3-2 Network Wide Backup & Restore Engineering Considerations
Integrated Network Management Rel 1.0 Standard July 1999
Estimated Time to Backup an OPC
The estimated time for OPC backup to complete is dependent on the following:
available bandwidth
number of controllers
concurrent jobs setting under the user preferences of the GUI
Estimated Time to Backup an NP
The estimated time for NP backup to complete is dependent on the following:
# of NPs on the same MOA
available bandwidth
number of NPs
Additional Capacities
The following table shows the engineering capacities for the backup and
restore GUI usage, as well the number of simultaneous backups and restores
allowed.
Table 3-1
Estiimated time to backup an OPC
# of OPC 56kb/s
Conc_Job=1
56 kb/s
Conc_Job=5
1.544 mb/s (T1)
Conc_Job=1
1.544 mb/s (T1)
Conc_Job=5
1 27 minutes 27 minutes 17 minutes 17 minutes
10 135 minutes 45 minutes 27 minutes 25 minutes
50 615 minutes 165 minutes 115 minutes 65 minutes
150 1815 minutes 465 minutes 315 minutes 165 minutes
Table 3-2
Estimated time to backup an NP
# of NP 56 kb/s 1.544 mb/s (T1)
1 7 minutes 4 minutes
10 70 minutes 40 minutes
50 350 minutes 20 minutes
150 1050 minutes 600 minutes
Zobrazit stránku 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 44 45

Komentáře k této Příručce

Žádné komentáře