Nortel Networks 10BASE-T Uživatelský manuál Strana 64

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 330
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 63
Using the BayStack 410-24T 10BASE-T Switch
1-34
309985-C Rev 00
Stack Up Configurations
In Figure 1-13
, data flows from the base unit (unit 1) to the next switch, which is
assigned as unit 2, and continues until the last switch in the stack is assigned as
unit 8. The physical order of the switches is from bottom to top (unit 1 to unit 8).
Figure 1-13. Stack Up Configuration Example
Stack Down Configurations
In Figure 1-14
, data flows from the base unit (unit 1) to the next switch, which is
assigned as unit 2, and continues until the last switch in the stack is assigned as
unit 8. The physical order of the switches is from top to bottom (unit 1 to unit 8).
Unit 7
Unit 8
1 = Last unit
2 = Base unit
3 = Cascade cable (PN 303978-A)
4 = Cascade max-return cable (PN 303979-A)
BS0033B
Unit 5
Unit 6
Unit 3
Unit 4
Unit 1
Unit 2
2
1
3
O
u
t
I
n
4
Zobrazit stránku 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 329 330

Komentáře k této Příručce

Žádné komentáře